1
H. Realtime Boftware
I.
Orbital Softwaro
J.
Proc/01 Software
fot
Bat
1
X. Terminal Server
L.
Cables
2.0 SCY DOCUMENTATION LIST
19
7.1
Facilities:
Delivered San #9.
Asiasat Extellite copies each)
Control Facility Specification (3
2.2
Hardware/Software Specifications (3 copies each; delivery three weeks prior to CDR).
a.
b.
C.
d.
f.
•
BCF system Specification (contract Exhibit B)
Limited Motion Antenna Subsystem Specification
Rr Subsystem Specification
Baseband Bubsystem Specification
Data Processing Buboystem Specification
Interface Development Specification
9.
Data Communications Subsystem Specification
1. various Unit Item Specifications
h.
status and Control Subsystem Specification
2.3
2.2.1
On-site Test Procedures
a. D.
Draft at PDR.
rinal upon shipment of equipment.
OVERALL SYSTEMS MANUAL
all SCF @quipments interfaces shall
ba
An overall systems manual, describing all
and intarelationships thair and provided. The manual shall include, as a minimum, a block diagram of all functional subsystems, switching and routing of all major signals, floor rack equipment layouto, pictorial views and summary performanos specification.
k
No comments yet.
Private notes are available after approval.