1

H. Realtime Boftware

I.

Orbital Softwaro

J.

Proc/01 Software

fot

Bat

1

X. Terminal Server

L.

Cables

2.0 SCY DOCUMENTATION LIST

19

7.1

Facilities:

Delivered San #9.

Asiasat Extellite copies each)

Control Facility Specification (3

2.2

Hardware/Software Specifications (3 copies each; delivery three weeks prior to CDR).

a.

b.

C.

d.

f.

BCF system Specification (contract Exhibit B)

Limited Motion Antenna Subsystem Specification

Rr Subsystem Specification

Baseband Bubsystem Specification

Data Processing Buboystem Specification

Interface Development Specification

9.

Data Communications Subsystem Specification

1. various Unit Item Specifications

h.

status and Control Subsystem Specification

2.3

2.2.1

On-site Test Procedures

a. D.

Draft at PDR.

rinal upon shipment of equipment.

OVERALL SYSTEMS MANUAL

all SCF @quipments interfaces shall

ba

An overall systems manual, describing all

and intarelationships thair and provided. The manual shall include, as a minimum, a block diagram of all functional subsystems, switching and routing of all major signals, floor rack equipment layouto, pictorial views and summary performanos specification.

k

Share This Page