A0L-Ci
SECRET UK EYES A LOCSEN
DATED
MAR 89
ANNEX F TO ATTACHMENT TO
108/756
POLICE EXPANSION PLAN IN RELATION TO GARRISON WITHDRAWAL PLAND 14 APR 89
1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997
1ST AND 2ND PTU AIID COS OPERATIONAL
B3RD AND 4TH PTU AID COS OPERATIONAL
N
2/7 GURKHA BN
TAKE OVER HALF THEBORDER
TAKE OVER FULL BORDER CONTROL
RESERVE BN IN BRUNEI
WITHDRAW 1ST BN
5TH AND 6TH PTU AID COS
OPERATIONAL
(APPROX 2ND BN)-
-(FLEXIBLE)
*-.-.-. (RESERVE BN IN BRUNEI/HONG KONG?)—.
WITHDRAWAL SUBJECT TO PREVAILING CONDITIONS NOTE1)
-ATH BN
BRD BN
1.
The Governor has stated he envisages a need for 2 resident battalions until the final handover date. interests but will require further consideration.
3 DAUPHIN REPLACEMENTS
RO...-UN CAKE-GOT
S
A
BOL-QUS
OPTIONS ON 4 DAUPHIN REPLACEMENTS TO BE
EXERCISED BY 1992 IF REQUIRED
8
(TO ENSUREĮ 6 AVAILABLE FOR SIMULTANEOUS HELILIFT OF HALF INF COL
6 AE & 2 IUR
6 MONTH TRIAL 6 UE & 2 IRR 16 UE/2 IRR OR 8UE FROM
END 89
3 DAUPHIN REPLACEMENTS
1 DAUPHIN REPLACEMENT
EXCO has indicated this may be in Hong Kong's
1 DAUPHIN REPLACEMENT
PROVIDE FULE. SUPPORT FOR
(92/93 SIMULTANEUOS LIFT FOR ONE PLATOON)
? WESSEX
(NOTE 2)
? SCOUT
(NOTE 2)
One platoon lift requires 4 Wessex. Garrison minimum LH support requirement is 4 Scouts, reducing to 3 once garrison reduces to a single UK
Final AE/UE/IUR/IRR ratios to be determined by study.
2.
battalion group.
3.
OLD SECTOR CONTROL LAUNCHES
3 RSRM
PEACOCK PATROL CRAFT
SECTOR.
STRO AUNCHES
1 MODERN SECTOR CONTROL LAUNCH
2 MODERN SECTOR CONTROL LAUNCHES
SMALL BOAT UNI REPLACED 3 RSRM
PEACOCK PATROL CRAFT NOTE 3
Disposal of PEACOCK PC and arrangements for future RN presence until final handover date to be determined by RN-led study.
F - 1 of 1 SECRET UK EYES A LOCSEN
Page 60Page 61
No comments yet.
Private notes are available after approval.