A0L-Ci

SECRET UK EYES A LOCSEN

DATED

MAR 89

ANNEX F TO ATTACHMENT TO

108/756

POLICE EXPANSION PLAN IN RELATION TO GARRISON WITHDRAWAL PLAND 14 APR 89

1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997

1ST AND 2ND PTU AIID COS OPERATIONAL

B3RD AND 4TH PTU AID COS OPERATIONAL

N

2/7 GURKHA BN

TAKE OVER HALF THEBORDER

TAKE OVER FULL BORDER CONTROL

RESERVE BN IN BRUNEI

WITHDRAW 1ST BN

5TH AND 6TH PTU AID COS

OPERATIONAL

(APPROX 2ND BN)-

-(FLEXIBLE)

*-.-.-. (RESERVE BN IN BRUNEI/HONG KONG?)—.

WITHDRAWAL SUBJECT TO PREVAILING CONDITIONS NOTE1)

-ATH BN

BRD BN

1.

The Governor has stated he envisages a need for 2 resident battalions until the final handover date. interests but will require further consideration.

3 DAUPHIN REPLACEMENTS

RO...-UN CAKE-GOT

S

A

BOL-QUS

OPTIONS ON 4 DAUPHIN REPLACEMENTS TO BE

EXERCISED BY 1992 IF REQUIRED

8

(TO ENSUREĮ 6 AVAILABLE FOR SIMULTANEOUS HELILIFT OF HALF INF COL

6 AE & 2 IUR

6 MONTH TRIAL 6 UE & 2 IRR 16 UE/2 IRR OR 8UE FROM

END 89

3 DAUPHIN REPLACEMENTS

1 DAUPHIN REPLACEMENT

EXCO has indicated this may be in Hong Kong's

1 DAUPHIN REPLACEMENT

PROVIDE FULE. SUPPORT FOR

(92/93 SIMULTANEUOS LIFT FOR ONE PLATOON)

? WESSEX

(NOTE 2)

? SCOUT

(NOTE 2)

One platoon lift requires 4 Wessex. Garrison minimum LH support requirement is 4 Scouts, reducing to 3 once garrison reduces to a single UK

Final AE/UE/IUR/IRR ratios to be determined by study.

2.

battalion group.

3.

OLD SECTOR CONTROL LAUNCHES

3 RSRM

PEACOCK PATROL CRAFT

SECTOR.

STRO AUNCHES

1 MODERN SECTOR CONTROL LAUNCH

2 MODERN SECTOR CONTROL LAUNCHES

SMALL BOAT UNI REPLACED 3 RSRM

PEACOCK PATROL CRAFT NOTE 3

Disposal of PEACOCK PC and arrangements for future RN presence until final handover date to be determined by RN-led study.

F - 1 of 1 SECRET UK EYES A LOCSEN

Page 60Page 61

Share This Page