852 5 868 5074 7.06
3. DESIGN CONCEPT
(A) Minimise geotechnical and site formation works to reduce construction
period and captial cost.
use existing flattish area for Stage I accommodation for 10,000 VBPS
use existing helipad site for Stage II accommodation for additional 10,000 VBPs
use best of existing buildings capable of conversion to new needs, e.g. LPG or DG scores, generator/diesel stores, switch rooms
etc.
all in preference to dotting buildings over hillsides with extensive slope cutting, retaining walls, increased underground plumbing, electrical, drainage services, fencing and increased security and management problems.
(B) Maximise the use of 3-storey buildings to afford space in camp areas
for group activities.
(C) Maximise facilities in view of remoteness of island to give
reasonable measure of self-dependence,
-
Kitchen and food storage
Medical services
Segregation units
Workshop and services (VAS)
Staff accommodation/mess/recreational facilities
(D) Permanent and reliable building services to avoid health and safety
hazards
-
fresh, treated water supply by WSD
sewage treatment system recommended by EPD
mains electrical supply by CL & P
fire fighting system requirements of FSD
new pier by CE/PW to provide berthing depth of 3m
(E) Crowd control, management
- 5.2m high fenced compounds to facilitate crowd control, security
and camp management