1989-10-11 16:46 SECURITY BRANCH
2. ROUGH INDICATION OF COSTS
2
1
852 5 868 5074 P.05
Stage 1
Sm
Stage t
$m
Total
$m
(A) Supply & erection of Prefab Buildings
41 No. 3-storey at $1.7m
32.80
37.90
70.70
2 No. 1-storey at $0.5m
(B) Builders work in concrete foundations,
drainage, washing areas, toilets, water storage tanks, plumbing, transformer room, etc.
30.00
13.30
43.30
(C) Electrical installations, perimeter
lighting, fire fighting system, water pumping systems, LPG storage, etc.
23.00
11.80
34.80
(D) Geotechnical works
7.00
8.00
15.00
(E) Security perimeter fences (5.2m high)
3.50
4.50
8.00
(F) Water Supply
55.00
55.00
- WSD submarine pipeline ($55m)*
desalination plant
($2/m)
harged supply
(S 1m)
(G) Sewage Treatment
60.00
60.00
EPD full system
($60m)* ($12m)
- Floating Barge(s)
(H) CL & P elect. mains supply
(I) Berthing Pier (Port Works)
(3) Contingency
10.00
-
10.00
12.00
8.00
20.00
$233.30m
$83.50m
3316.80m
say $320
Av. cost per head = $16.000
Notes
1. Whitehead costs for Stages I & II - $140.6m for 8,000 population
2. Pillar Point
$17,575 per head.
- $79m for 5,000 population $15,800 per head.