2. ROUGH INDICATION OF COSTS

2

1

852 5 868 5074 P.05

Stage 1

Sm

Stage t

$m

Total

$m

(A) Supply & erection of Prefab Buildings

41 No. 3-storey at $1.7m

32.80

37.90

70.70

2 No. 1-storey at $0.5m

(B) Builders work in concrete foundations,

drainage, washing areas, toilets, water storage tanks, plumbing, transformer room, etc.

30.00

13.30

43.30

(C) Electrical installations, perimeter

lighting, fire fighting system, water pumping systems, LPG storage, etc.

23.00

11.80

34.80

(D) Geotechnical works

7.00

8.00

15.00

(E) Security perimeter fences (5.2m high)

3.50

4.50

8.00

(F) Water Supply

55.00

55.00

- WSD submarine pipeline ($55m)*

desalination plant

($2/m)

harged supply

(S 1m)

(G) Sewage Treatment

60.00

60.00

EPD full system

($60m)* ($12m)

- Floating Barge(s)

(H) CL & P elect. mains supply

(I) Berthing Pier (Port Works)

(3) Contingency

10.00

-

10.00

12.00

8.00

20.00

$233.30m

$83.50m

3316.80m

say $320

Av. cost per head = $16.000

Notes

1. Whitehead costs for Stages I & II - $140.6m for 8,000 population

2. Pillar Point

$17,575 per head.

- $79m for 5,000 population $15,800 per head.