The JVC's Executive Committee and General Management considered that this non-conformance should be dealt with seriously and scientifically. We should recognise the serious nature of this non-conformance which should not occur. We should make thorough investigation
the reasons occurrence. During the treatment of this non-conformance, PRC and expatriate specialists should fully cooperate. process of finalising the technical solution, the principle of "safety first, quality first" must be adhered to. Irrespective of which solution to be adopted, the original design criteria
technical standards must and
The be met.
identification of weaknesses in project quality management and control and the
of the
and the contractor improvement measures
are an
The important process in dealing with this non-conformance, project quality management and control must be improved to stop similar non-conformance from recurring.
JVC
The JVC's policy on the treatment of this non-conformance was follows:
(1) To put a hold point on the pouring of concrete on Unit 1
reactor building raft.
(2)
(3)
(4)
(5)
The
To check that all other types of reinforcing bars in the first layer had been placed correctly.
To arrange the Ear design team and in line with the policy of giving priority to safety and quality, to determine a technical solution which completely meets all requirements of the original design.
To present the technical solution to the National Nuc le ar Safety Administration (NNSA) to ensure that they had no objection.
To investigate how and why the non-conformance occured and the responsibilities of the parties concerned, to review the controls and procedures used
used for implementing civil construction work,
and
to determine improvements are needed to avoid further occurrences,
actions plan of
8 EM
carried
out by the
the
what
JVC
in
above conjunction with the EdF design team and the contractor HCCM.
22.
The Treatment of The Non-conformance
There were three phases in dealing with this non-conformance by the JVC:
Phase One: September 15 - 29, Investigation of Problem
The
work
of
this
in this pha se included: investigation non-conformance, fomulation of the principles in handling non-conformances, establishment of plans and steps to finalise
the
and
the
reporting
of this
solution, technical non-conformance to the JVC Board, the Department in Charge (Ministry of Nuclear Industry),
National Nuclear
Administration (NNSA) and the JVC's shareholders.
Safety