- 39
-
4.2.19
After the
completion of the Wutong Hills Tunnel,
cross-border traffic at Shatoujiao is expected to
increase substantially. The eastern approach road to
the bridge linking Luoma zhou and Kuangpang has heen
completed. Site formation work for the western section
of the road has also been completed. It is expected
that the whole crossing will be completed in 1988 as
scheduled.
4.2.20 At present, about 8,000 cross-border permits have been
issued to goods vehicles registered in Hong Kong. Due to rapid economic developments, it is found that this
number is not sufficient. In March this year, the
Shenzhen government requested the Hong Kong Government
to issue permits to goods vehicles registered in
Shenzhen SO that there could be a balance of traffic
flow, but no reply has yet been received.
4.2.21 Or flood preventior works, there has been close liaison
in the last five years between Sherzhen and the relevant
departments of the Hong Kong Governmert in carrying out
joint geological surveys, soil testing and other works.
Ότι various occasions, the Shenzher Government has
separately discussed with the Political Adviser and the
Chief Secretary on ways and means to speed up the flood
prevention works, but the deadline of August for
starting work has not been met.
4.2.22 winding up the presentation, Mr.
the presentation, Mr. Zhang emphasised that
Shenzher and Eong Kong have been cooperating very well
in promoting the economic development since 1982. Five
working groups have been formed to deal with various
activities, i.e. (1) border crossing; (2) river
regulation; (3) road transport; (4) water transport and
(5) improvement of the railway station. Items nos. (4)
and (5) have been completed. For example, the ferry