5.
Nature of Work
12
Classification of
Spocified Process
under Application
Mode of Operations (Continuous/Batch)
Installed/ Processing Capacity
6.
Noxious or Offensive Emissions
Mode of Discharge to Atmosphere
Silo Capacity (for Cement Works Only)
Total No. of Emission Points
Exhaust
Emission
Gas
Point No. Flowrate
(m3/h)
Exit
Fugitive Temperature Emission (°C) (Yes/No)
Discharge or Chimoy Height
If NOT discharged
upward freely,
Cross-section of Discharge Exit or Chimney
Highest Building/
Structure within 100m of the Premises
(m)
please specify
Width Length Diameter
Distance
(01)
(in)
(m)
(四)
Haight (m)
* Delete if not applicable