5.

Nature of Work

12

Classification of

Spocified Process

under Application

Mode of Operations (Continuous/Batch)

Installed/ Processing Capacity

6.

Noxious or Offensive Emissions

Mode of Discharge to Atmosphere

Silo Capacity (for Cement Works Only)

Total No. of Emission Points

Exhaust

Emission

Gas

Point No. Flowrate

(m3/h)

Exit

Fugitive Temperature Emission (°C) (Yes/No)

Discharge or Chimoy Height

If NOT discharged

upward freely,

Cross-section of Discharge Exit or Chimney

Highest Building/

Structure within 100m of the Premises

(m)

please specify

Width Length Diameter

Distance

(01)

(in)

(m)

(四)

Haight (m)

* Delete if not applicable

Share This Page