existing Castle Peak Road will be maintained
until such time as traffic can be diverted onto
the new service road.
(d) A section of the access road leading to the
Telephone Exchange Building at Chuk Yuen.
This section is to be re-graded and
improved. Access will be maintained during
construction.
(e) A section of the access road leading to a
school at Sheung San Wai.
This section is to be re-graded and
improved. Access during construction to the
existing Castle Peak Road will be maintained
until such time as traffic can be diverted
onto the new service road.
(f) Seven run-ins connecting Castle Peak Road to
adjacent developments.
These run-ins are to be re-graded and
improved. Access will be maintained during
construction.
(ii) Closure of the following as shown black on Plan
No. NH 6153A: