existing Castle Peak Road will be maintained

until such time as traffic can be diverted onto

the new service road.

(d) A section of the access road leading to the

Telephone Exchange Building at Chuk Yuen.

This section is to be re-graded and

improved. Access will be maintained during

construction.

(e) A section of the access road leading to a

school at Sheung San Wai.

This section is to be re-graded and

improved. Access during construction to the

existing Castle Peak Road will be maintained

until such time as traffic can be diverted

onto the new service road.

(f) Seven run-ins connecting Castle Peak Road to

adjacent developments.

These run-ins are to be re-graded and

improved. Access will be maintained during

construction.

(ii) Closure of the following as shown black on Plan

No. NH 6153A: