OADS(WORKS, USE AND COMPENSATION) CROTOL (Chapter 370) Scheme annexed to Flan No. H 4535 describing the proposed Footbridge across Hennessy Road at Fercival Street
1) General descrition of the works
The objective of the propòsed footbridge across Hennessy Road at Fercival Street is to segregate the vehicular and pedestrian traffic, thereby alleviating the serious pedestrian and vehicular conflict which persists at the junction of leru essy Road and Percival Street. The proposed works, as shown on lan No.
involves the construction of
PH4535,
i) a 4 clear width, 35m long covered footbridge across
Hennessy Road at Percival Street,
ii) a temporary staircase on Fercival Street next to IL 2836, iii) a staircase at mid span on Hennessy load and the
associated tan shelter.
iv) a staircase and escalator on Fercival Street next to L 365, and
v) associated road and drainage works.
2) Apparatus to be altered or diverted
The existing services and utilities such as gas mains, electric cables and ducts, telephone cables and ducts, lying within the limits of the works area shown on plan, or adjacent thereto, will require removal or repositioning in the course of carrying out the said works. Further
rotices, setting out the winner in which such services ard utilities
will be removed or repositioned, will be issued under section 20 of the Ordinance as and when required.
G
September 1985
Mucha (CHAN Nai-keong)
Secretary for Lands and Works