TNAG-1505-FCO40-2063-Guangdong-nuclear-power-station-project-at-Daya-Bay-safety-c-1986 — Page 55

FCO40 Hong Kong Department Records 聯邦事務部香港部檔案 All

1

|

Office of Administration I

Director Ye Jiechun 1 1 Deputy Dir. Feng Shufang |

ORGANIZATION

1986 7

OF NNSA

National Nuclear Safety Administration Director General

Deputy Director General Executive

Deputy Director General Chief Engineer

Deputy Chief Engineer

Jiang Shengjie |

Shi Guangchang Zhang Yunan Lin Chengge Xu Wanjin Dong Bainian

1

1

I

r

Advisory Committee of Nuclear Safety │

Director

Deputy Director

Jiang Shengjie I Dai Chuangzen I

|

I Division of Regulations 11 | Division of Review and

Licensing-1

1 1

Director Zhang Chongyan Deputy Dir.

I Director I Deputy Dir.

Wang Fa

Zhong Wanli

I

Zhao Renkai

Luo Anren

II Division of R

Review and Licensing-2

I Director

Qiao Zhi | | | Deputy Dir. Bian Hongxing

1

1 Division of

Research

Division of Inspection I |

I

Shanghai Regional

I

I Guangdong Regional|

Inspection Office

1

| Inspection Office

I

Director

Li Zhiyu

1

Deputy Dir.

Zhao Yimin

Director Chen Chengkai | Deputy Dir. Lan Ziyong

Director

| Director

Deputy Dir.

| Deputy Dir.

L.

Annex F

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.