SEP 02 '86 16:44 TIB(OOL) HK GOVT
182
P.8
(4)
operational steps in the event of
an accident or an
emergency warranting a shutdown; (Ref: 2.3.28)
to join the IAEA Convention оп Early Notification of A Nuclear Accident and the Convention on Assistance in The Case of A Nuclear Accident or Radiological Emergency; (Ref : 2.2.26)
(5) to draw up comprehensive and well-coordinated emergency
plans for the safety of the people living in
in the close vicinity (10 Km by French standard, 10 miles by US Standard, and 8-10 Km by Japanese standard) of the Daya Bay plant; (Ref: 2.3.23; 3.4.7; 4.5.4)
(6) to enter cross boundary agreements with Hong Kong on the exchange of information and coordination of contingency planning; (Ref: 2.2.23-26; 3.4.13; 3.6.8)
5.2.4 Central Management
(1)
(2)
(3)
to take up a further technical assistance contract with Electricite de France after commissioning and during the life span of the Daya Bay plant; (Ref: 2.4.15)
to delineate clearly the sphere of responsibilities between the government ministries and agencies for management and regulatory control of nuclear plants so as to ensure that there are checks and balances; (Ref
2.2.27-28; 3.7.1; 3.7.13; 4.1.5)
to establish an independent advisory body for nuclear safety and nuclear regulatory control with Hong Kong participation, and to draw on the knowledge and experience of experts from
No comments yet.
Private notes are available after approval.