TNAG-1499-FCO40-2057-Guangdong-nuclear-power-station-project-at-Daya-Bay-safety-c-1986 — Page 199

FCO40 Hong Kong Department Records 聯邦事務部香港部檔案 All

NCK 166/1

CONFID

IDEN'

FRICCA

47923 - 2

YA

OCMIAN 7923

CONFIDENTIAL

00 PARIS

FM INDUS TO PARIS

041700Z JUL

GRS 232

CONFIDENTIAL

FM DTI

TO IMMEDIATE PAR IS

TELNO INDUS 61

041700Z JULY 86

AND TO IMMEDIATE PEKING

INFO IMMEDIATE HONG KONG, BTC HONG KONG

INFO ROUTINE UKMIS VIENNA

(2166

YOUR TELNO 673: GUANGDONG NUCLEAR SAFETY

TELECONS ALTY/WHITE

1

2164

FOLLOWING DISCUSSION WITH FCO, WE AGREED TO SUGGEST FOLLOWING AMENDMENT TO RAVIER TO BRING PARA 4 OF THE FRENCH

SPEAKING NOTE NEARER OUR ORIGINAL.

2

QUOTE: IN PARTICULAR, WE HOPE THAT THE FULLEST PUBLICITY

CAN BE GIVEN TO THE IMPORTANCE AND RESPONSIBILITY OF THE NUCLEAR SAFETY ADMINISTRATION AND THE MEANS BY WHICH IT INTENDS TO ENSURE

THE MAINTENANCE OF IMPECCABLE SAFETY STANDARDS THROUGHOUT THE

CONSTRUCTION PERIOD AND THEREAFTER. WE PROPOSE THAT THE CONTENT

AND ARRANGEMENTS FOR THIS PUBLICITY ARE CONSIDERED IN ADVANCE

COLLECTIVELY BY ALL THREE GOVERNMENTS TO MAXIMISE ITS IMPACT IN

REASSURING HONG KONG.

3

UNQUOTE.

THIS WOULD ALLOW US AN OPPORTUNITY TO PRESS THE CHINESE

SUBSEQUENTLY TO INVOLVE THE FRENCH/IAEA FOR A LONGER PERIOD SHOULD THEIR CURRENT PROPOSALS APPEAR INADEQUATE.

1

CONFIDENTIAL

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.