TNAG-1499-FCO40-2057-Guangdong-nuclear-power-station-project-at-Daya-Bay-safety-c-1986 — Page 198

FCO40 Hong Kong Department Records 聯邦事務部香港部檔案 All

the

Confidential

OPEN-ENDED INVOLVEMENT IN THE OPERATION OF THE GUANGDONG STATION

AFTER COMMISSIONING.

4. INSTRUCTIONS WILL NOW BE FORMALLY CLEARED FOR TRANSMISSION BY THE QUAI D'ORSAY AND ARE UNLIKELY TO REACH PEKING UNTIL EARLY NEXT WEEK. GRATEFUL TO KNOW AS SOON AS POSSIBLE IF FRENCH TEXT PRESENTS SUBSTANTIAL PROBLEMS FOR YOU.

FRETWELL

GUANGDONG

LIMITED

HKD

FED

NED

TRED

PUSD(MR CROWLEY)

[COPIES SENT TO NO 10 DOWNING STREET]

PS

PS/MR RENTON PS/PUS

SIR W HARDING

MR DAUNT

MR WILSON

ADDITIONAL DISTRIBUTION

GUANGDONG NUCLEAR

Confidential