TNAG-1499-FCO40-2057-Guangdong-nuclear-power-station-project-at-Daya-Bay-safety-c-1986 — Page 182

FCO40 Hong Kong Department Records 聯邦事務部香港部檔案 All

SECRET

B

assessment

At the end of last week the Governor's (Hong Kong telno 2132) was that with few exceptions earlier support for Hong Kong involvement in the project had turned to opposition. He expressed the view that after the LegCo

debate on the

the adjournment scheduled for 16 July we should be fortunate to get through the present Legco session without a further debate, on the motion expressing the view that the Chinese Government should be asked to move the plant (or, presumably, to convert it to a thermal station).

possibly

6. On 4 July, however, UMELCO decided to mount their own independent investigation

the safety aspects of

am seeking (although I

.

power.

into

I assume

the

nuclear Governor's confirmation of this point) that the possibility

therefore) of an early hostile motion in Legco has receded

7.

the

Preventon was

terable

It would be as well, however, to consider what some of implications would be if, sooner or later, such a

to be

be tabled and adopted in LegCo. It would

and ourselves

ourselves with a

with a very face the

the Hong Kong Govenment and difficult prospect. The Governor would be likely to argue strongly that the only tangible position for the HKG would be for official members of LegCo to associate themselves with such a motion. Whatever the exact position adopted by officials, the implications of the motion for UK/Hong Kong relations would be serious. Unless, we were seen to be ready to act in Hong Kong's

in Hong Kong's interests, we could face the charge that we were disregarding the fears of the Hong · Kong people, motivated only by concerns of commercial gain our desire to maintain good relations with China.

!

8. At present this is no more than a hypothesis, and I do

think that it need be

not

Secretary of

State's minute.

directly addressed in the

Howe HMG would have

to

so

respond in such circumstances is difficult to predict

far ahead. But the minimum needed for HMG to demonstrate

SECRET

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.