D/ENEPAY
CODE 18-77
Mr Morphet
CHINA
I went t had oak
to mai
Au.01 24 3771
see Dr Harbisoles
Akt 166/1
18 JUN 1986
04.06,86 16:25 POT
RA.
اچھا
132A
Mr Agre
Mr Steele
Mr Hayward NED/FCO Mr Alty
Dnlo
ds-not-have the information yo
SEXVDPL
him for. According to him, Friends of the Parth tri- quartione uhou! Townch durigno? Sale at the Strewell Inquiry but did not develop this line of argument. However, while I had Dr Harbison's attention, I took the opportunity of agreeing with him the following 'lines to take' for inclusion in the briefing:
Although the Nuclear T-tallations Inspectorate have never assessed the Fe reactor in detail, they have no reason to doubt that the general characteristics of the French plant, developed the basis of the Westinghouse design, are such licenseable in the UK.
it would be
The UK authorities have had discuss.ons with the French authorities and we are satisfied that the French
require a high standard of safety in their reactors.
2. I have also had talks with the Foreign Office about the earlier request from the Chinese for help with their graphita reactors, which request may be repeated on this or
4165
VOA EG
LAC MAANGEW
1.
similar in design to those at Chernobyl The request turned down because the reactors are principally use : purposes and I suggest we adhere to this line using the briefing which has been agreed with the Foreign Office:
3.
We understand that currently Chinese nuclear react
is used for military purposes and
Are
13
we regret we cannot assist with requests / co-operation on in-service inspections.
14
uld be grateful for your urgent views. The briefsce
inclusion in the briefing for the Queen and the Frize which is due to be completed later today.
B FREEMAN
ANZA
Room 1579 Ext 7151 4 June 1986
i
No comments yet.