MAKE USE OF THE REPORTING SYSTEM ALREADY

ESTABLISHED FOR THE PROJECT.

DURING THE INITIAL PHASE OF THE CONTRACT,

WHEN THE CRITICAL MANUFACTURING OPERATIONS

ARE TO TAKE PLACE, THE DEPARTMENT WILL

RECEIVE TECHNICAL REPORTS FROM GEC ON DESIGN

AND MANUFACTURING PROGRESS.

THE DEPARTMENT WOULD BE READY TO ATTEND

THE MORE IMPORTANT PROGRESS REVIEW

MEETINGS. THE DEPARTMENT UNDERSTANDS

THAT INITIALLY THESE WOULD NORMALLY

TAKE PLACE IN THE UK OR FRANCE.

DETAILED DISCUSSIONS WILL AGAIN BE

REQUIRED TO ESTABLISH AT WHICH MEETINGS

THE DEPARTMENT SHOULD BE REPRESENTED.

IV

IN ACCORDANCE WITH GEC'S CONTRACTUAL

RESPONSIBILITIES, THE DEPARTMENT WOULD

EXPECT ITS MONITORING ACTIVITY TO

REDUCE FOLLOWING DELIVERY OF EQUIPMENT

BY GEC. HOWEVER THE DEPARTMENT WOULD

PROPOSE TO MAINTAIN ITS MONITORING TEAM

UNTIL PROVISIONAL ACCEPTANCE OF THE

SECOND UNIT, AT WHICH TIME IT WOULD

REVIEW WITH THE CLIENT THE NEED FOR

CONTINUED MONITORING DURING THE

THE ABOVE ARRANGEMENTS ARE DESIGNED TO ENSURE

THAT THE DEPARTMENT IS FULLY AWARE OF THE

PROGRESS MADE ON THE PROJECT AND THE EXTENT TO

WHICH UK COMPANIES ARE MEETING THEIR CONTRACTUAL

OBLIGATIONS. SHOULD THE DEPARTMENT BECOME AWARE,

THROUGH THE REPORTS IT RECEIVES OR APPROACHES

FROM THE CLIENT, THAT THE PERFORMANCE OF UK

COMPANIES IS GIVING SERIOUS CAUSE FOR CONCERN,