- 2 -
"
(b)
to modify the design of the Shatin Junior
School with a view to reducing the scope
to an 18-classroom school; and
(c) to proceed with the design of a 12-classroom
ܐ ܐ܂
school at Queen's Gardens for the reprovisioning
of Glenealy Junior School.
Apart from the above new schools, 2 other E.S.F. projects
are in the pipe-line, viz. the Shatin Secondary School in Area 41A,
Shatin, and the Sandy Bay Junior School at Pokfulam, Hong Kong.
The secondary school is expected to be completed and operational
by September 1985 while the junior school is currently at the
design stage, scheduled for completion in 1987-88.