- 2 -

"

(b)

to modify the design of the Shatin Junior

School with a view to reducing the scope

to an 18-classroom school; and

(c) to proceed with the design of a 12-classroom

ܐ ܐ܂

school at Queen's Gardens for the reprovisioning

of Glenealy Junior School.

Apart from the above new schools, 2 other E.S.F. projects

are in the pipe-line, viz. the Shatin Secondary School in Area 41A,

Shatin, and the Sandy Bay Junior School at Pokfulam, Hong Kong.

The secondary school is expected to be completed and operational

by September 1985 while the junior school is currently at the

design stage, scheduled for completion in 1987-88.

1.

1:

Share This Page