HIGHWAY STRATEGY
TABLE 5.4
IMPLEMENTATION PROGRAMME
CONFIDENTIAL
COMPLETION DATE
MID 1980s
LATE 1980s EARLY 1990s
MID 1990s
LATER
SCHEME
(1)
PROPOSALS FOR NWNT
Tuen Mun E. Bypass Eastern Corridor
Yuen Long S. Bypass NWNT
Au Tau
-
Yau Kom Tau
-
Lam Kam
Kam Tin Road Improvements
Kam Tin Bypass
Western
Corridor
(1)
NEW TOWN
Northern Access
D2
-D2
D2
D2
·S 2.
S 2
Southern Access
31
(1)
AIRPORT
Access
(2)
COMMITTED/PROGRAMME D
Route 2 Au Tau
Fanling Bypass
-
Fanling
Lam Kam Wo Hop Shek
Shatin
North Tai Po
Tsuen Wan
-
Tsuen Mun
West Kowloon Way
Tsing Yi North Bridge
PROPOSALS
OUTSIDE NWNT
-
(3)
Tsuen Wan
Route 5 Shatin Tsing Yi South Bridge Route 16 Shatin
Lai Chi Kok
Yau Kom Tau Crossing Tsing Yi Tunnel Route
West Kowloon Expressway Western Harbour Crossing
D3
D3-
D2.
Notes: (1) NTDC proposals
(2) Under construction, in detail design stage or programmed
www
-
(3) Proposals put forward by consultants and Government studies including
North Lantau Transport Access Study Wilbur Smith and Associates Additional Harbour Crossing Facilities Wilbur Smith and Associates A Feasibility Study of Alternative Transport Development in the Shatin Tsuen Wan Corridor Halcrow Fox and Associates Development Investigation of the NWNT
-
-
NTDC
Comment:
see
The programme shows earliest feasible completion dates on the basis of discussions with Government and consultants. Earlier completion may be desirable; paragraph 5.6.7 at seq.
5-26
CONFIDENTIAL
No comments yet.
Private notes are available after approval.