7 July 1982]
THE INDUSTRY AND TRADE COMMITTEE
15
[Continued
ANNEX E
AID AND TRADE PROVISION IN ASEAN
UK Content
A OFFERS ACCEPTED
August 1980
MALAYSIA
Airport Master Plan (British Airports International)
£50.0m
PHILIPPINES
March 1980
Rural Electrification
£14.5m
(Balfour Beatty)
December 1980
Mini hydro study-
(linked with electrification
on project above)
PHILIPPINES
September 1980
Woodburning Power Stations
£8.6m
(Balfour Beatty)
INDONESIA
May 1982
Mrica Hydro Scheme
£13m
(Balfour Beatty)
B OFFERS MADE, BUT STILL UNDER CONSIDERATION
INDONESIA
Diesel Locomotives
£10m
MALAYSIA
Aluminium Smelter Study
£0.32m
MALAYSIA
Port Kland Switchgear
£3.9m
Port Klang Transformers
£6.1m
MALAYSIA
HICOM Copper Complex Study
£0.07m
MALAYSIA
Diesel Locomotives
£3.6m
INDONESIA
Maung Hydro Scheme Design Study
£2.1m