7 July 1982]

THE INDUSTRY AND TRADE COMMITTEE

15

[Continued

ANNEX E

AID AND TRADE PROVISION IN ASEAN

UK Content

A OFFERS ACCEPTED

August 1980

MALAYSIA

Airport Master Plan (British Airports International)

£50.0m

PHILIPPINES

March 1980

Rural Electrification

£14.5m

(Balfour Beatty)

December 1980

Mini hydro study-

(linked with electrification

on project above)

PHILIPPINES

September 1980

Woodburning Power Stations

£8.6m

(Balfour Beatty)

INDONESIA

May 1982

Mrica Hydro Scheme

£13m

(Balfour Beatty)

B OFFERS MADE, BUT STILL UNDER CONSIDERATION

INDONESIA

Diesel Locomotives

£10m

MALAYSIA

Aluminium Smelter Study

£0.32m

MALAYSIA

Port Kland Switchgear

£3.9m

Port Klang Transformers

£6.1m

MALAYSIA

HICOM Copper Complex Study

£0.07m

MALAYSIA

Diesel Locomotives

£3.6m

INDONESIA

Maung Hydro Scheme Design Study

£2.1m

Share This Page