Mr. Clift (o.R Mr. McLaren

ман

Su x.

We are getting rather more

this kind of phraseology.

CONFIDENTIAL

use

FM BTC HONG KONG Ø51040Z MAR 81

TO IMMEDIATE F C O

TELEGRAM NUMBER BTC 34 OF 5 MAR

INFO ROUTINE PEKING

FROM MANZIE

д

Any germs for the future?

MIPT PARAGRAPH 5. FOLLOWING IS TEXT OF GEC RECORD.

BEGINS

MR CHEN GANG'S CONCLUDING STATEMENT AT MEETING WITH

GEC IN GUANGZHOU ON 28 FEBRUARY 1981:-

Artaald 63

THIS IS THE SECOND MEETING MR STONES AND I HAVE HAD WITH GEC, THE FIRST ON COMMERCIAL MATTERS. THE NUCLEAR POWER STATION TO BE BUILT AS A JOINT VENTURE OF GPC AND CLP

IS A CHINESE FIRST'' AND I WOULD LIKE TO DRAW GEC ATTENTION

TO THE ROLE THIS POWER STATION PLAYS IN THE RELATIONSHIP

BETWEEN U K AND CHINA. THIS RELATIONSHIP IS DIFFERENT FROM THAT

BETWEEN FRANCE AND CHINA. BOTH RELATIONSHIPS ARE GOOD.

2. CLP IS IN HONG KONG WHICH IS PART OF CHINESE TERRITORY,

ALTHOUGH ADMINISTRATED FROM THE UK. THE UK SHOULD THEREFORE

GIVE PREFERENTIAL SUPPORT TO THE PROJECT.

3. THE FEASIBILITY STUDY MENTIONED THAT ECONOMIC AND

TECHNICAL CONDITIONS BEING EQUAL, PREFERENCE WOULD BE GIVEN TO U K AND CHINESE SOURCES FOR EQUIPMENT. THIS STATEMENT

WAS INCLUDED TO REFER SPECIFICALLY TO THE TYPE OF SITUATION

WE ARE DISCUSSING. THAT IS WHY BOTH GPC AND CLP WERE CONCERNED

ABOUT BOTH TECHNICAL AND COMMERCIAL ASPECTS. THEY DESIRED TO

SEE THE UK COMPETITIVE, MEANING TECHNICALLY GOOD, PRICE

COMPETITIVE AND WITH GOOD LOAN TERMS.

4. ON THE TECHNICAL FRONT WE HAVE HAD SOME RESERVATIONS ABOUT GEC

AND WE HOPE THAT THE TECHNICAL PRESENTATIONS WHICH HAVE BEEN

GOING ON OVER THE LAST 2 DAYS WILL ENABLE US TO WITHDRAW

THESE RESERVATIONS. HOWEVER, THE INDICATION YOU HAVE GIVEN