Part I

CONFIDENTIAL ##

Subject

Purpose

Major Develop- To make a comprehensive study of ment Studies

(a) N. Lantau

(ENV (SPU) 70/61/

01)

the development potential of various regions in Hong Kong to provide the basic information on a comparable basis for the selection of a prefer- red development strategy.

A

(b) N.W. New

Territories (ENV (SPU) 70/61/

03)

Progress Made & Present Position

Next Quarter Targets

a) N. Lantau

a) N. Lantau

(i)

The Stage II(i) development investigation report was evaluated by the NL Develop- ment Steering Group.

(i)

(ii) Further studies on the replace-

ment airport at Chek Lap Kok continuing.

*(iii) Detailed design of the

Lantau Fixed Crossing being carried out by consultants.

b) N.W. Territories

(i)

Consultants continued with the NWNT development study.

Submit an interim report to LDPC on Stage II(1)

and obtain ap- proval for further development of conceptual plan- ning proposals and detailed engineering studies.

(ii) Monitor progress

in studies relat+ ing to CLK replace- ment airport.

(iii) Monitor progress

(i)

in detailed design of the Lantau Fixed Crossing.

b) N.W. New Territories

Monitor progre of NWNI study (completion mid- 1931)