CONFIDENTIAL
機密
ANNEX C
KOWLOON-CANTON RAILWAY (BRITISH SECTION)
PROPOSED FARE STRUCTURE FROM 28.1.80
Equivalent
ordinary
Journey
Existing Proposed
fare
Rate of
single
Existing
fare
increase
journeys
Revenue
Proposed Revenue
1978/79
(%)
($000's)
(000's)
($000's)
KN/MK
MK/KN
40%
50%
25.0
73
29
37
SN
70¢
90%
28.6
1506
1054
1355
UN
$1.00
$1.30
30.0
1304
1304
1695
TPK/TPM
$1.30
$1.70
30.8
2415
3140
4106
J
FL/SS
$1.60
$2.10
31.3
2376
3802
4990
Lo Wu
$1.90
$2.50
31.6
3290
6251
8225
SN
UN
40€
50¢
25.0
124
50
62
TPK/TPM
70%
90¢
28.6
157
110
141
- FL/SS
$1.00
$1.30
30.0
144
144
187
Lo ilu
$1.30
$1.70
30.8
37
40
63
UN
TPK/TPM
40¢
50%
25.0
151
60
76
- FL/SS
70¢
90%
28.6
69
48
62
Lo Wu
$1.00
$1.30
30.0
3
3
4
TPK/TPM
TPM/TPK
30¢
40¢
33.3
38
11
15
FL/SS
50¢
60¢
20.0
149
75
89
· Lo Wu
70%
90¢
28.6.
50
35
45-
FL/SS
SS/FL
30¢
40¢
·
33.3
15
5
6
Lo Wu
40¢
50%
25.0
226
90
113
12127
16259
21271
30.83%
Notes
1.
The first class fare is double the existing fare. Monthly tickets are calculated on the basis of 20
return tickets.
GF 323
CONFIDENTIAL #
No comments yet.
Private notes are available after approval.