CONFIDENTIAL

機密

ANNEX C

KOWLOON-CANTON RAILWAY (BRITISH SECTION)

PROPOSED FARE STRUCTURE FROM 28.1.80

Equivalent

ordinary

Journey

Existing Proposed

fare

Rate of

single

Existing

fare

increase

journeys

Revenue

Proposed Revenue

1978/79

(%)

($000's)

(000's)

($000's)

KN/MK

MK/KN

40%

50%

25.0

73

29

37

SN

70¢

90%

28.6

1506

1054

1355

UN

$1.00

$1.30

30.0

1304

1304

1695

TPK/TPM

$1.30

$1.70

30.8

2415

3140

4106

J

FL/SS

$1.60

$2.10

31.3

2376

3802

4990

Lo Wu

$1.90

$2.50

31.6

3290

6251

8225

SN

UN

40€

50¢

25.0

124

50

62

TPK/TPM

70%

90¢

28.6

157

110

141

- FL/SS

$1.00

$1.30

30.0

144

144

187

Lo ilu

$1.30

$1.70

30.8

37

40

63

UN

TPK/TPM

40¢

50%

25.0

151

60

76

- FL/SS

70¢

90%

28.6

69

48

62

Lo Wu

$1.00

$1.30

30.0

3

3

4

TPK/TPM

TPM/TPK

30¢

40¢

33.3

38

11

15

FL/SS

50¢

60¢

20.0

149

75

89

· Lo Wu

70%

90¢

28.6.

50

35

45-

FL/SS

SS/FL

30¢

40¢

·

33.3

15

5

6

Lo Wu

40¢

50%

25.0

226

90

113

12127

16259

21271

30.83%

Notes

1.

The first class fare is double the existing fare. Monthly tickets are calculated on the basis of 20

return tickets.

GF 323

CONFIDENTIAL #

Share This Page