PRELIMINARY ESTIMATE OF COST OF NUCLEAR POWER STATION IF BUILT IN GUANGDONG PROVINCE
ник
RA.
Capacity
2 x 900 MW Pressurised Water Reactors (PWRs)
"Cost in
heiti
Teken
EQUIPMENT (excluding Fuel) (Transformers, Turbines, Nuclear
Island and other station auxiliaries)
This assumes 100% financed by loans including capital interest
US$ M
1900
Interest Rate
taken at 71% p. a.
Escalation Rate
taken at 10% p. a.
*
ERECTION
(including Specialist Services)
600
This assumes 100% financed by loans - including capital interest
Interest Rate
taken at 71% p. a.
Escalation Rate
taken at 10% p. a.
TRANSMISSION EQUIPMENT
500
**
!
(Towers, Transformers, Cables,
Capacitors, Reactors, etc.)
This assumes 100% financed by loans
including capital interest
Interest Rate
Escalation Rate
taken at 7% p. a.
taken at 10% p. a.
CIVIL WORKS (to be carried out by KEC - estimated at 70% of Hong Kong price)
This assumes 100% financed by loans including capital interest
Interest Rate
-
taken at 71% p. a.
Escalation Rate
-
taken at 10% p. a.
610
US$ 3610 Million
-
E.&O.E.
*
Total Estimated Cost (Excluding Land)
ALL FIGURES APPROXIMATE
Foreign Exchange required
** If Foreign Exchange required
June 23, 1980
C. c. H. E. Sir Murray MacLehose