PRELIMINARY ESTIMATE OF COST OF NUCLEAR POWER STATION IF BUILT IN GUANGDONG PROVINCE

ник

RA.

Capacity

2 x 900 MW Pressurised Water Reactors (PWRs)

"Cost in

heiti

Teken

EQUIPMENT (excluding Fuel) (Transformers, Turbines, Nuclear

Island and other station auxiliaries)

This assumes 100% financed by loans including capital interest

US$ M

1900

Interest Rate

taken at 71% p. a.

Escalation Rate

taken at 10% p. a.

*

ERECTION

(including Specialist Services)

600

This assumes 100% financed by loans - including capital interest

Interest Rate

taken at 71% p. a.

Escalation Rate

taken at 10% p. a.

TRANSMISSION EQUIPMENT

500

**

!

(Towers, Transformers, Cables,

Capacitors, Reactors, etc.)

This assumes 100% financed by loans

including capital interest

Interest Rate

Escalation Rate

taken at 7% p. a.

taken at 10% p. a.

CIVIL WORKS (to be carried out by KEC - estimated at 70% of Hong Kong price)

This assumes 100% financed by loans including capital interest

Interest Rate

-

taken at 71% p. a.

Escalation Rate

-

taken at 10% p. a.

610

US$ 3610 Million

-

E.&O.E.

*

Total Estimated Cost (Excluding Land)

ALL FIGURES APPROXIMATE