CONFIDENTIAL #
ANNEX C TO XCC(78)73
Hong Kong Electric Co. Ltd.
Pattern of Expansion
Total Added
Retired installed capacity capacity capacity
(megawatts) (megawatts) (megawatts) (megawatts)
Maximum
demand
Year
Existing
1968
251
60
405
1969
274
60
465
1970
304
465
1971
342
1 (GT) 10
456
1972
370
125
581
1973
423
125
20 )
641
3x15)
1974
442
11 (GT)
652
1975
460
125
777
1976
519
125
902
1977
587
902
1978
654
125)
5x30 )
2x25)(GT)
13
} (GT)
926
Present
926
capacity
(806 Ap Lei Chau) (120 - North Point)
Planned
1979
723
125
2x60
931
(North Point closed)
1980
794
125
1,056
1981
866
125
1,181
Full capacity
of existing station
1,181
at Ap Lei Chau
Proposed
1982
940
250
1,431
1984
1,105
250
1,681
1986
1,294
250
1,931
1988
1,510
250
2,181
1990
1,757
350
2,531
1992
2,037
350
2,881
2,881
Existing, planned
and proposed capacity
Notes:(i)
(ii)
GT Gas turbine, Sets from 1982 onward
would be Dual-fired. All other sets are Oil-fired.
This statement includes capacity at North Point, which is now seldom used,
and which will be fully retired by 1979.
CONFIDENTIAL
機密
No comments yet.
Private notes are available after approval.