(E) HIGH AND LOW VOLTAGE TRANSFORMERS, SWITCHGEAR, DISTRIBUTION BOARDS, CABLES, EARTHING, CATHODIC PROTECTION DIRECT CURRENT SYSTEMS AND BATTERIES, MOTORS, GENERATOR EXCITATION EQUIPMENT,
LIGHTING.
(F) CONTROL AND INSTRUMENTATION EQUIPMENT FOR ALL THE PLANT ITEMISED ABOVE, INCLUDING REMOTE CONTROL AND INDICATION, DATA RECORDING, ALARM INDICATION, SEQUENCE CONTROL, AUTOMATIC
CONTROL OF PLANT GROUPS, LOCAL INDICATION, METERING,
TELECOMMUNICATIONS.
(G) SYSTEMS ENGINEERING AND RELIABILITY.
4.1 SITE DEVELOPMENT
さ
BEI WILL ADVISE ON THE SUITABILITY OF FINAL RECOMMENDATIONS FOR
DEVELOPMENT OF THE SITE.
4.2.1 EVALUATION DURING CONTRACT NEGOTIATIONS
BE! WILL ASSIST KESCO IN ANY FURTHER TECHNICAL EVALUATION
RELEVANT TO THE EQUIPMENT TO BE SUPPLIED UNDER THE GEC CONTRACT.
4.2.2 EVALUATION IN UK. DURING DESIGN STAGE
BEI WILL:
(A) ASSIST KESCO IN MONITORING ALL THE ACTIVITIES OF GEC AND THEIR SUB-CONTRACTORS INCLUDING PLANNING, WORK SCHEDULING AND DESIGN PROGRESSION TO ENSURE THAT THE DESIGN WORK BEING UNDERTAKEN
CONFORMS WITH THE OVERALL REQUIREMENTS OF THE PROJECT:
:
1
(B) EXAMINE ON BEHALF OF KESCO, OR JOINTLY WITH KESCO, PLANT DESIGN PROPOSALS SUBMITTED BY GEC AND THEIR SUB-CONTRACTORS IN
RELATION TO THE TECHNICAL SPECIFICATIONS FOR CONSTRUCTABILITY, RELIABILITY, SATISFACTORY AND ECONOMIC OPERATION AND MINIMUM
CAPITAL COST.
!
(C) NOMINATE A MEMBER OF THE BEI PERSONNEL AS RESPONSIBLE OFFICER WHO WILL HAVE DIRECT ACCESS TO AND THE ASSISTANCE OF SENIOR
ENGINEERING DESIGN STAFF IN THE FIELDS OF BOILERS, TURBINE- GENERATORS, FEED HEATING AND CONDENSING PLANT, ELECTRICAL PLANT,
CONTROL AND INSTRUMENTATION EQUIPMENT, AUXILIARY MECHANICAL
PLANT, THERMODYNAMIC CYCLES, PLANNING, AND STATION LAYOUT,
COOLING WATER SYSTEM AND COAL AND ASH HANDLING PLANT.
(D) SUBMIT QUARTERLY PROGRESS REPORTS TO KESCO.
4.2.3 QUALITY ASSURANCE
BEI WILL:
(A) PROVIDE QUALITY ASSURANCE SERVICES TO KESCO ON PLANT, EQUIPMENT AND COMPONENTS FOR THE POWER STATION.