148
HOFO 008/18
ASTI
GR 33955
CYPHER/CAT A
FM BTC HONG KONG 180405Z
CONFIDENTIAL
REGIS
;
10 JULAT
TO PRIORITY DTI TELNO.CREDA 107 OF 18 JULY.
FOR MACDONALD IC2.
NO DISTRIBUTION
+5
Top +2 DOT (CRE) DOTCCRE
Dup R129/
K + G D
11 TRED (2)
GRATEFUL YOU PASS FOLLOWING CONFIDENTIAL MESSAGE TO
وهل
PUSD (2)
F.W DAVENPORT, TRANSMISSION DIVISION CEGB, GUILDFORD, TELEX 859291. FROM 1.P GILLSON, CEGB TEAM NOW IN HONG KONG.
BEGINS:
HONG KONG POWER PROJECT.
Ri
(147
1. CLIENT WISHES OFFER TO INCLUDE DESIGN AND SUPPLY H.V EQUIPMENT AS FOLLOWS TO CONNECT PROPOSED POWER STATION TO EXISTING SYSTEM. LONG TERM REQUIREMENTS TO TAKE OUTPUT A STATION 4 X 350MW AND B STATION 4 X 500 MW FIRST SET COMMISSIONING EARLY 1982 BUT
LINES REQUIRED FEB 1981 FOR COMMISSIONING SUPPLIES AT 132KV. OPERATING VOLTAGE PROBABLY 400KV. TUNNEL SEEMS UNLIKELY AND NO
IMMEDIATE STUDY REQUIRED.
2. I SHALL REQUIRE INFORMATION BY MONDAY 25 JULY ON THE FOLLOWING:-
(A) OVERHEAD LINES.
TWO DOUBLE CIRCUITS EACH TO TAKE FULL DEVELOPMENT OUTPUT. SEA CROSSINGS REQUIRED AND GENERAL DESIGN PARAMETERS THUS.
(1) TEMPERATURE AND WIND AS SHATIN HAMMER HILL.
(2) SPARES OF CROSSINGS A1.7KM B 1.1 KM.
(3) NAVIGATION CLEARANCE 200 FEET.
(4) TOWER SETTING HEIGHTS FOR BOTH CROSSINGS ASSUME ONE
END SEA LEVEL AND OTHER AT PLUS 150 FEET.
(5) ASSUME ROCK FOR FOUNDATIONS WITH HALF SUITABLE ROCK
ANCCHORS.
(6) ANCHMR TOWERS FOUNDED AT CROSSING TOWER LEVEL
ONE END AND AT OTHER ROCK RISES 45 DEGREES BEHIND TOWER.
No comments yet.
Private notes are available after approval.