TNAG-0426-FCO40-472-Construction-of-an-underground-railway-system-in-Hong-Kong-1973 — Page 90

FCO40 Hong Kong Department Records 聯邦事務部香港部檔案 All

0003160 G.F. 316

SECRET

Government's Requirement

VIII.

Interface with Consultants

The consortium should be prepared to take over responsibility for detailed design as and when basic data and design parameters are available and performance specifications for E & M equipment are defined.

Yes

-7-

Japanese

Present Indications (as at 5th December 1973)

Anglo-Italian

Yes

H.K. ́etro Constructors

Yes

SECRET

Page 90Page 91

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.