0003160 G.F. 316

SECRET

Government's Requirement

VIII.

Interface with Consultants

The consortium should be prepared to take over responsibility for detailed design as and when basic data and design parameters are available and performance specifications for E & M equipment are defined.

Yes

-7-

Japanese

Present Indications (as at 5th December 1973)

Anglo-Italian

Yes

H.K. ́etro Constructors

Yes

SECRET

Page 90Page 91

Share This Page