0003160 G.F. 316
SECRET
Government's Requirement
VIII.
Interface with Consultants
The consortium should be prepared to take over responsibility for detailed design as and when basic data and design parameters are available and performance specifications for E & M equipment are defined.
Yes
-7-
Japanese
Present Indications (as at 5th December 1973)
Anglo-Italian
Yes
H.K. ́etro Constructors
Yes
SECRET
Page 90Page 91