2 -

is necessary to eliminate any interference between the

licensees' transmissions, after a final frequency plan is

provided by the Telecommunications Authority to the licensees.

(6) (a) The licensee shall not activate its

transmitter or associated equipment without

the prior written approval of the

Telecommunications Authority.

(b) The licensee shall be required to conduct

full power test transmissions from any new

transmitter intended to be operated by the

licensee for a period of not less than 21 days

before approval may be given to transmit a

programme service from the transmitter.

(c) If the test transmissions referred to in

paragraph (b) indicate that any interference

with any existing transmission service could

result there from the Telecommunications Authority

may withold permission to operate the transmitter

until he is satisfied that the interference

has been eliminated.

(a)

If interference occurs between the

transmission services of two or more licensees

after a licensee has commenced to operate a

new transmitter the Telecommunications

Authority may require the licensee operating

CONFIDENTIAL