5.

Insel

Draft Continuation Sheet

CONFIDENTIAL

(ii) Projects costing between £50,000 and £100,000

A fuller description of the project should

be given covering points (a) to (g) in (i)

above together with a statement of the way in which

(h) The operating costs will be financed

when the project is completed?

Plans should be forwarded if the project

includes building or civil engineering works.

between

(iii) Projects costing over £100,000 and less then

£250,000

The description of the project should cover

all the points listed at (a) to (h) above,

together with the following -

(i) Whether consultants will be used (i)

in the design stage and (ii) to supervise

construction or if not, how construction

will be supervised.

(j) Availability or proposed provision of

power, water and other services.

Plans should be forwarded if the project

includes building or civil engineering works.

Projects costing less than £100,000 and most of those

costing less than £250,000 are normally approved in the

Ministry of Overseas Development at Head of Department

level under authority delegated by H.M. Treasury and

if information under these headings is adequately

supplied no unnecessary delay should ensue.

In dealing with (b) 'benefits to be derived from

the project' information should be given covering

both direct benefits e.g. seles of products,

increase in Secondary School places, additional

hospital beds etc. and indirect benefits, e.g.

increased revenue to be derived as a result of the

project, increased employment created both

during construction and operating stages and any

Comments