d) Having regard to (a), (b) and (c), to consider the number,

type and size of vessels required, and make recommendations concerning an operational scheme (s), noting that whilst off-loading will be dealt with locally, the recommendations should include staffing requirements at the loading ports.

3. Report

The Report of the Survey Team should be available by mid- September, 1967.

Marine Department, 2nd August, 1967.