TANG
Vehicular access at lower ground floor
rocky sub-soil and concrete founda- tions are taken down to solid ground without the need for piling.
Accommodation
All the hospital's engineering ser- vices and equipment, which includes boilers, a transformer and an incinera- tor for the destruction of waste, are located on the sub-lower ground floor to keep the noisy areas from the other departments.
Above, on the lower ground floor, is the emergency and casualty de- partment containing a waiting and reception area immediately inside the
Maternity ward at fourth floor level
15
entrance, a resuscitation room, five examination and treatment rooms, an injection room, an office for the nurs- ing sister, duty room and storage.
To the other side of the waiting area are a medical officer's office and consulting room, a treatment room, minor operating theatre and an X-ray department. This layout makes it pos- sible to divide the patients into two streams, those requiring immediate re- suscitation or attention and those attending for follow-up treatment or examination.
The general out-patients depart- ment and maternal and child health
centre are placed on the ground floor to provide the most convenient accessi- bility for the patients. Each department takes up half the floor space and has a separate entrance and waiting area, approached from Queen's Road East.
On the first floor are a skin clinic and social hygiene clinic, while on the second floor are a maternal and child health service headquarters and train- ing school, library, conference room, lecture and demonstration rooms. Quar- ters for eight nurses or midwives are also included on this floor.
The third floor contains the 38-bed casualty ward and the fourth floor the 36-patient maternity ward. Staff quar- ters and a canteen are located on the top floor, food being delivered to the lower floors by means of dumb waiters.
Contractors
The total building cost, excluding architectural fees but including founda- tions and sub-contracts, was approxi- mately HK$3.2 million. The project took 15 months to complete.
Fook Wah Construction Co. were the main contractors. Sub contractors included:
―
Site formation Chuen Hing Co. Electrical installation The China Engineers, Ltd.
-
Lifts-Hitachi Elevator Engineering Co. (HK) Ltd.
Steel windows -- China Steel Works Ltd.
Gas installation - The Hong Kong & China Gas Co. Ltd.
Far East BUILDER, July 1969