PROPOSED FACTORY
MATERIALS STORE
every 2 ft., enabling plug-in fused con- nector boxes to be connected to any of these points without disconnecting the supply. The system was supplied by the Power Centre Co. of United Kingdom.
The air-conditioning system to the office areas, the plate making and layout department (ground floor) and the graphic arts department (mezzanine floor) is of 87 tons capacity and is served by 175 h.p. and 140 h.p. com- pressors and seven chilled water air handling units.
Costs
The total cost of the project was S$2,540,243, which is made up as follows:
Site preparation
Structural steelwork (supply and erection)
General building work
S$
30,951
184,750
1,669,126
Fibreglass valley gutters
(supply and fixing)
33,867
Sanitary and water
installation
137,272
Electrical installation
158,573
Air-conditioning installation 126,000
Mechanical ventilation
69,413
Sprinkler installation
113,658
Roof fire vents (fusible links) 11,866
Letterings, signboards and
4,767
2,540,243
Ø
flagpoles
Contractors
The main contractor was Soh Beng Tee & Co. Ltd. and the construction time was nine months.
Sub-contractors and suppliers in-
cluded:
Ltd.
Earthwork Soh Beng Tee & Co.
Structural steelwork Kwok & Sons Ltd.
-
George
Site plan
air induced through large fans and dis- tributed by ducts running the full length of the bays aided by motor driven extract fans at high level on the roof. The large fans for the air intake are situated outside the building to minimise noise and a feature has been made of their housings over the main doors to the factory bays.
Finishes
Internal floor finishes to both the factory and the materials storage bays is a 2 in. thickness of granolithic, top- ped monolithically with a 1/2 in. thickness of heavy duty Ferrogram 'AA'.
On the factory floor a coloured
264 FT
surface has been obtained by the use of Green Colorcrete, finished with a waxed polish. Wall dadoes to a height of 7 ft. in the industrial areas are finished in Vitracote, a hard wearing epoxy resin paint, and all other surfaces both internal and external have an emulsion paint finish.
A particular feature of the building is the use of fibreglass for the large valley gutters between the bays and for the large water storage tanks — a much higher first cost aimed at avoiding recurrent maintenance costs.
Another feature is the 250 and 400 amp. aluminium busbar trunking which serves two bays of the factory and which is equipped with tap-off points
Sanitary and water supply Yat Lye Ltd.
-
Electrical installation Reliance Electric (Pte) Ltd.
installation
Air-conditioning I.A.C. Singapore (Pte) Ltd..
Eaves and valley gutters, etc. Fibreglass (M) Ltd.
-
-
Letterings Electro Mechanical Industries Ltd.
Illuminated signboard and flagpoles
- Diethelm & Co. Ltd.
Mechanical ventilation
Singapore (Pte) Ltd.
-
-
I.A.C.
Roof extractor unit General Electric Co.
·
Colt fire vents Sime, Darby & Co. Ltd.
Sprinkler installation & Co. Ltd.
McAlister
24
Far East BUILDER, June 1969