No_6_July_and_August__1949 — Page 17

Far East Builder 遠東建築雜誌 All

OTIS ELEVATOR COMPANY

HONG KONG SHANGHAI BANK BUILDING

THIRD FLOOR

TEL. 30932

HING ENG

RECOGNIZED

BY

ARCHITECTS. EN-

GINEERS AND BUILD-

ING

MANAGEMENTS,

AS THE ONLY SYSTEM

OF ELEVATOR OPERA-

TION

THAT

FUNCTION

WILL

EFFEC-

TIVELY FOR ALL CON-

DITIONS OF TRAFFIC

FLOW.

Peak-Period

SIGNAL-CONTROL

Gearless Passenger Elevators

After a corridor button has once been pressed, it positively will stop the first elevator available approach- ing the landing in the proper direction.

Car and hoistway doors open automatically as soon as the car arrives in the landing zone and with no action on the part of the attendant.

False and unnecessary stops are completely eliminated.

The excellent service rendered by Signal-Control is not dependent upon the mental or physical qualifications of the attendants.

Advance lighting of hall lanterns indicates to waiting passengers which car will surely respond to their call and they can be ready to enter as soon as the car arrives.

The elimination of unnecessary stopping and starting prolongs the life of the entire elevator plant and reduces the power consumption to a minimum.

Branch Offices

OTIS ELEVATOR COMPANY

935 Peking Road West

Shanghai, China

142 13th. Street

Port Area

Manila. Philippines

5 Malacea Street

Singapore

15

-

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.