OTIS ELEVATOR COMPANY
HONG KONG SHANGHAI BANK BUILDING
THIRD FLOOR
TEL. 30932
HING ENG
RECOGNIZED
BY
ARCHITECTS. EN-
GINEERS AND BUILD-
ING
MANAGEMENTS,
AS THE ONLY SYSTEM
OF ELEVATOR OPERA-
TION
THAT
FUNCTION
WILL
EFFEC-
TIVELY FOR ALL CON-
DITIONS OF TRAFFIC
FLOW.
Peak-Period
SIGNAL-CONTROL
Gearless Passenger Elevators
After a corridor button has once been pressed, it positively will stop the first elevator available approach- ing the landing in the proper direction.
Car and hoistway doors open automatically as soon as the car arrives in the landing zone and with no action on the part of the attendant.
False and unnecessary stops are completely eliminated.
The excellent service rendered by Signal-Control is not dependent upon the mental or physical qualifications of the attendants.
Advance lighting of hall lanterns indicates to waiting passengers which car will surely respond to their call and they can be ready to enter as soon as the car arrives.
The elimination of unnecessary stopping and starting prolongs the life of the entire elevator plant and reduces the power consumption to a minimum.
Branch Offices
OTIS ELEVATOR COMPANY
935 Peking Road West
Shanghai, China
142 13th. Street
Port Area
Manila. Philippines
5 Malacea Street
Singapore
15
-
།