19:1
The whole new building, of R.C. frame with cantilevered corridor balconies, is L-shaped, built on a 45 degree sloping site which serves the structure on three levels. A hori- zontal louvre along the balcony serves as weather protection.
Walls and partitions are of brick. Foundations are part on piles and part resting on rock. An expansion joint separates the two.
Addition of this new extension to the school means that it is now pos- sible to move between any parts of the school and remain under cover the whole time.
Lavatories have trough basins with self-closing taps. W.C. doors have drop hinges so that they stay open when not in use.
Filtered drinking water is provid- ed on each half landing of the cen tral stair.
All floors are of Rubb-Grano, except the audio-vision room which has vinyl tile flooring. Lavatories have mosaic tile flooring and tiled dadoes.
The total cost of the new wing was $1,300,000.
The architect was Mr. A.J. Brandt of Eric Cumine.
The general contractor was Lam Woo and Co. Sub-contractors were: ELECTRICAL: Wah Tung Co. PLUMBING: Wah Tung Co. LIFT: Jardine Engineering Corp.
Ltd. (Schindler).
FIRE PROTECTION: Shun Yick
Co.
PILING: Pressure Piling Co. and
Intrusion-Prepakt.
PAINTING: Duro Primers for wood and metal, Duro synthetic enamels and undercoats, Duro- crete waterproof cement paint.
TORI
CHEN
STORE
CLASS
NO.12
RM.
CLASS RM.
NO.II
CLASS
NO.IO
RM.
CLASS
RM.
NO.9
DN
LAV.
DN
CORRIDOR
OPEN
ACCESS
RAILING
PANTRY
00000
STUDENT ACTIVITY
NEEDLE
WORK
COOKING RM.
GROUND FLOOR PLAN
SCAL E
16
32
48 FT.
FIRST FLOOR
PLAN
OPEN
ACCESS
CORRIDOR
ENTRANCE
-BUILDING
LINE
OPEN
ABOVE
ACCESS
CORRIDOR
RAILING
ON-
LAV.
ON
CLASS RM NO.5
PASSAGE
UP
CLASS RM.
NO.6
CLASS RM.
NO.7
CLASS RM.
CHEMISTRY LABORATORY
STORE
PHYSICS LABORATORY
EXISTING RM.
STORE
THE HONG KONG & FAR EAST BUILDER
-
VOLUME 15, NUMBER 6
31
NO.8
LIFT
ST.