H
The entrance staircase hall.
Sheltered playground-cum-auditorium.
cation that it provides. In 1928. modation of any kind, and accord- the Sisters of the Immaculate Con- ing to the standard of that time the ception first opened the Tak Sun Tak Sun School was not badly hous- Anglo-Chinese School in Shamshui- ed. But its building was not special- po, and there the school remained ly designed as a school; its rooms, until the Pacific War, when, like so though pleasant and well-ventilated. many institutions of its kind, it was were a little on the dark side and, suspended for the period of Occupa- because of their size, they were tion. After the war. the school re- somewhat wasteful of teachers." sumed its activities, but in a dwelling house at its present address. Austin Road. In those early post-war days we were glad to get school accom-
General Contractor: Mei On & Co.
Plumbing Installation: Tung On
Plumbing Co., Ltd.
Electrical Installation: The Jardine
Engineering Corp., Ltd.
Metal Windows: Hong Kong Metal
Window Mfg. Co., Ltd.
Cement floor tiles & special cement facing tiles: Yuen Cheong Tile Co.
Facing tiles & Mosaic tiles; Grand
Traders. Ltd.
Gas Cooking Equipment:
China Gas Co., Ltd.
H.K. &
In the new Alexandra House Extension...
JEC
you'll find
ATLAS
LIGHTING FITTINGS AND LAMPS
Where better lighting is required
ATLAS
will provide it!
Atlas fittings and flourescent lamps have been
used throughout the public areas and corridors.
Supplied & installed by:-
THE JARDINE ENGINEERING CORPORATION, LTD.
14-16 Pedder Street
45
Tel: 38081
ר
J
==
A.
No comments yet.
Private notes are available after approval.