(Left) One of the bright, airy class-
YOOMS.
(Right) The old and the new build-
ings.
T
SHELTERED
PLAYGROUND
1. 1 T1.
EXISTING
BUILDING
playground, there is an Assembly Hall with a seating capacity of 325, com- plete with a permanent wood floored stage. Large changing and storage rooms are provided below the stage. The Assembly Hall is to be used for physical training as well, and for this purpose a shower room was incorpor- ated as part of the changing room for the benefit of the athletes.
The framing of the building has been designed so that an additional floor and a roof playground can be added at anytime in the future.
As has already been mentioned, the original playground of the school was not completely occupied by the new building. Re-alignment of the origin- al driveway made it possible to pro- vide sufficient space for a full sized basket-ball court adjoining the As- sembly Hall and the covered play- ground.
The driveway from Austin Road has also been widened so as to allow ve- hicular traffic to reach both the old
STORE
NEW
DRIVE
WAY
SURFACING
Ground floor plan, showing positions of old and new building, with typical floor plan of new building above.
ten to VI. There is an additional Government donated $187,500. pre-school private kindergarten for balance was made up by contribu- The another 98 little are 180 boys and girls in the free expended on furniture and equip- scholars. There tions. An additional $46.000 has been
sessions, the morning one which is night school. The school has two ment.
taught in the English language and Mr. Crozier, in his speech at the the afternoon one which is taken in opening ceremony, said: "It gives Chinese.
my wife and me the greatest plea-
and the new buildings. In addition A Boy Scout and Cub Troop and sure to be present this afternoon at to the driveway, a stepped approach Pack has been_formed. An active leads from Austin Road to the cover-
and Teachers Association ed playground.
Parents exists.
the opening of this new wing, the latest addition to a school which has been in operation for almost 30 years, and which, under the guidance As a subsidized urban school, the The new school cost $422.000 to of the Sisters of the Immaculate Tak Sun Anglo-Chinese School now construct, including electrical and Conception. has already earned a has 1.350 boys in grades kindergar- plumbing installations, of which high reputation for the kind of edu-