foundations and sub-contracts,
was
HK$1,521,000, External works cost a further HK$167,000.
Unit costs were as follows:
HK$ per
Section
HK$ per
sq. ft.
cu. ft.
Main school
24.00
2.04
Dining hall
24.35
1.86
Staff flats
(excl. lift)
28.91
2.49
Assembly hall
18.37
1.09
Average overall
24.40
1.92
CODE
These costs are still subject to final measurement.
Contractors
The main contractor was Hsin Heng Construction Co.
Sub-contractors and suppliers in-
cluded:
Gilman and Co. Ltd. electrical. The China Engineers Ltd. hard-
ware.
―
plumbing.
Lee Yu Kee Ltd. Shewan Tomes (Equipment) Ltd.- flooring (Mastipave).
Morlite Steel Windows Ltd. windows.
British General Electric Co. Ltd.
lifts (Fiam).
Suzuki Shutter Co. (HK) Ltd,
roller shutters.
Assembly hall interior. Ceiling is
sound-reflecting, fair-face concrete
Hexagonal tables in a typical classroom at second floor level
Main entrance to school from Ede Road
12 SAGANES
Beacon Hill School
Far East BUILDER, May 1968.