No_4_May_-_June__1958 — Page 35

Far East Builder 遠東建築雜誌 All

bed

room

kitchan

dining

+

serv

kitchen

servants

kitchan

H

hall

Lift hall

hall

kitchen

dining

bod room

Living room

ilving room

bedroom

bedroom

bedroom

Bedroom

Laboratory

LIFE

hall

Ludios Lav

plant records

staff lav

stana

MA

(ents Lax,

chemis:

ponaration engineer

resident *ngineer

assistant ras anginaar

generat office

drawing offica

recorda

room

clark of works

erectors

rasm

playground

perte secara

uft

hall

playground

Dining-room From The Living-Room

paraging for Sixteen cars

(Top): Typical apartment floor plan.

+

(Centre): The first floor

offices. (Below): Ground floor, garages and playgrounds.

Showing Slatted Teak Built-in Bookcase

On the second to fifth floors are External finishes are natural colour eight 3-bedroom 2-bathroom flats. Shanghai plaster to beams and The company provides furniture and columns, contrasting with buff colour the majority of this has been built in. Japanese ceramic facing tiles to the A slatted teak bookcase wall with brick panels. The lattice screens are built-in electric fireplace forms the of traditional green Chinese ventilat focus of the living rooms, with writing ing tiles.

desks in side alcoves. Living-rooms Ground floor paving is of washed are separated from dining-rooms by granolithic in random squares and sliding doors. A teak service bar with floors of the office corridor and flat glass shelving and service hatch forms lift halls of white vinyl plastic tiles. the wall between the dining-room and The offices, the flat bedrooms, dining- Lully-equipped kitchen. The company rooms

The company rooms and living-rooms are finished also provides two air-conditioners to in teak parquet, and balconies, kit- each flat and provision has been made chens and bathroom floors in light in the external walls for these to be

grey mosaic tiles. Laundries and positioned in either bedrooms, living servants' rooms floors are finished in rooms or dining-rooms.

red quarry tiles.

The structure is reinforced concrete Contractors

framed, with brick panel walls, hollow tile floor slabs and flush ceilings

General Contractor: Construction Co.

Chang Sung

33

Plumbing Contractor:

Co., Ltd.

Sanitary Equipment:

Standard

(China), Ltd.

Dodwell &

American

Inniss & Riddle

Electrical Contractor: The British

General Electric Co., Ltd.

Lift Installation: Otis Elevator Co. Rock Asphalt Roofing: Dreyer &

Co., Ltd.

Henderson Sliding Door Gear:

William Jacks & Co., Ltd. Locks and Hardware: William

Jacks & Co., Ltd.

Lefco Acid Resisting Laboratory Tiles: William Jacks & Co., Ltd. Air Conditioning Units: Davie.

Boag & Co., Ltd.

Sunaire Curtain Track: Jones Wong

& Co.

Naco Louvres: John D. Hutchison

& Co

Crittall Metal Windows & Doors:

Dodwell & Co., Ltd.

Vinyl Plastic Tiling: Hope & Co. Piling Vibro Piling Co., Ltd. Demolition: Hung Yue & Co.

Page 35Page 36