TOILET
CARPENTER
PROPS
1
VISION STUDIO B
VISION STUDIO 'A'
V.I.P.
PRODUCERS
CONTROL
AIR DUCT
MOTOR
RM
UP
FILM STORE
FLAT
ROOF
ON UP
LAV. UP
ON
SECRETARIAT
TELECINE
LOBBY
'CONT'C'
CORRIDOR
STUDIO 'C'
.AV
ARTISTES
ROOM
MAKE UP
STORE, ENGINEERS
KITCHEN
AHINIH
LOBBY
CORRIDOR
ACCOUNTANT
TYPISTS
CANTEEN
<RECREATION
ROOM 租
SECRETARY
C A L
J
14
Fifth Floor
24 FT.
16
24 FT.
Seventh Floor
The rest is taken up by the H.K. editing department are all situated tariat, with private offices for the Electric Company's transformer room, thereon.
Accountant and Secretary. There will staircases and lavatories. In order
be a canteen and recreation room, Two big Vision Studios, two storeys that all shops may have mezzanine high, will extend through from the with fully-equipped kitchen attached. floors, the height of the ground floor fifth to the sixth floor. On the fifth The eighth floor will contain the will be over 17′ compared with the a good deal of space will be reserved offices of the programme secretariat 12′ of the upper floors.
for the Producer's Control Room for the Controller of Programmes, and
The rear part of the first floor will Telecine, and the artistes' room. Minor the Assistant Controller. The Manag- be subdivided into a huge store and areas will be allocated to an engineers' ing Director's office with separate con- offices for foremen, engineers and store, the carpenters' props, a make- ference room, and offices for various draughtsmen of Rediffusion, Ltd., and up room, a V.I.P. room and a small secretaries, are also included. the Company will utilise the rear of soundproof studio.
There is a small apartment on the the second floor for a very large On the sixth floor there will be a roof, consisting of one living room Vision workshop, a Vision Engineer's spectators' gallery for Studio "B". and a bedroom, complete with kitchen office, and a small store.
Most of the processing and developing and bathroom.
Just under half the third floor's for TV activities will be housed on Specially planned
planned airconditioning area will be rented out. Cable and this floor. There will be a projection has been provided for the Vision Wireless, Ltd. will occupy a consider room, a darkroom, a store, a caption- Studios.
able area in the centre, and at the ing and editing room complete with
back, along the Jaffe Road side, will filmracks all of which are connect- It is expected that the building will be a carpentry and equipment work ed with the Telerecording Vision De- be completed by the end of the present shop, including the Equipment En- partment. The Vision Producers' year, or very shortly after. gineer's office and stores.
From the fourth floor upwards all library with tape-editing room, and available space is reserved for Redif- the office fo the Engineer-in-Charge, fusion requirements. Five studios of will also be found here.
script room with library, the Chinese
varied dimensions, all completely Up to the height of the seventh soundproof, and all complete with floor the full dimensions of the build- announcers' and technicians' booths, ing are entirely utilised, but from will occupy most of this floor. The this level there is a setback from laffe programme and script department, Road which reduces the depth from the English library, central control 116' to just over 70'. This floor will room, studio engineers' stores and be occupied by the Rediffusion secre-
12
General Contractor: Sung Foo Kee. Piling The Vibro Piling Co., Ltd. Lifts: Otis Elevator Co. Air-Conditioning: International En-
gineering, Ltd. Sanitary Installation:
Co., Ltd.
Electrical Installation:
Engineers, Ltd.
Dodwell &
The China
Soundproofing: Cellocrete Building
Service, Ltd.
No comments yet.
Private notes are available after approval.