ROBERTSON Q-FLOOR CONSTRUCTION
TO GIVE STRUCTURAL STRENGTH:
1 Cellular Steel Q-Floor Unit
2 Structural Concrete Topping
3 Bonding Anchor
TO GIVE ELECTRICAL ACCESS:
4 Header Duct
5 Header Duct Junction Unit
6 Tray containing Floor Finish,
covering Junction Unit
(10)
7 Rising Connector between Header
Duct and Distribution Board
8 Lighting, Power or Telephone Floor
Pedestal Outlet
steel light weight and great strength. Despite their great load-carrying capacity, the longest units can be handled and put in place easily by two men.
Q-Floor units arrive at site bundled ready for lifting to the required floor level. An average bundle would contain 250 square feet of floor area and yet weigh less than three-quarters of a ton. This lightweight characteristic enables large areas of floor to be lifted to the exact required level with the minimum of hand- ling, thus saving time and money in labour and hoisting equipment.
Immediately the Q-Floor units are lifted to the required floor level they are laid between the supporting beams. No sub- sidiary lifting gear is required to move the units from the hoisting point across the floor level. Two men can handle and position accurately one unit (up to 38 square feet of floor area) in readiness for the welder to secure it to the supporting beams.
Each and every Q-Floor unit is tailor- made to suit the structural framework and is designed to fall into place with a minimum of site cutting and shaping.
Robertson Q-Floor construction speeds the entire job. The placing of the floor units can keep pace with the erection of the structural steel, and as each floor is laid, it immediately becomes a safe work- ing platform.
Bricklayers,
electricians and other
9 Blanking-off Disc over Header Opening tradesmen can follow right on the heels
DECORATIVE TREATMENT:
10 Floor Finish
11 Suspended Ceiling
of the structural workers.
are
The steel Q-Floor provides ample space at the required floor level for the storage of materials awaiting use. Loose plank. With the present-day congestion in Q-Floor is essentially a quick, light- ing and other temporary platform con- cities and industrial areas throughout the weight construction. Speed of erection structions
eliminated. Stairways can world, design and planning engineers are and service as a working platform for go in at once, eliminating dangerous and faced with the problem of economic usage other trades enable buildings to be com- slow ladder access from floor to floor. of space available to them, which in pleted and occupied at an early date many instances demands the erection of which, in turn, means money in the bank buildings higher than those to which we for the building owners. have been accustomed.
ever before conscious of
The complete electrical wiring system The building owner is today more than offered by Q-Floor construction ensures that the building is adaptable to the ever- the rapidly changing techniques of the commercial increasing use of electrical equipment world and is anxious to ensure that his light, telephone and other electronic de- vices which is revolutionising modern building investment does not become ob- business methods. solete at an early date.
tion.
The entire building is erected with fewer delays, with greater safety to workmen and with better working conditions.
Necessary scaffolding can be erected directly on to the Q-Floor.
The dry, clean Q-Floor construction results in continuous work for all sub- contractors and eliminates delays due to setting of wet materials.
Q-Floor construction ensures reduced The structural concrete topping to Q- These two requirements are among initial cost through lightweight, faster Floor can be placed at any time to fall those met by Robertson Q-Floor construc- construction, less temporary materials and in with the general contractor's program- quicker occupancy and continued sav. me. Curing of the concrete topping need ings throughout the lifetime of the build- never delay other vital trades from get- ing because of its built-in
guarantee ting on with the job. against electrical obsolescence.
for
Q-Floor has been manufactured more than twenty years, and Q-Floor construction has been used extensively in multi-storey buildings throughout the American continent.
Full information concerning Q-Floors The design of Robertson Q-Floor units can be obtained from the local representa- combines the two inherent qualities of tives. Messrs. Davie, Boag & Co., Ltd.
ALL SUBSCRIBERS TO THE
HONG KONG & FAR EAST BUILDER MAGAZINE
ARE ENTITLED TO A FREE COPY OF THE
HONG KONG & FAR EAST BUILDER DIRECTORY
75
—
No comments yet.
Private notes are available after approval.